esenfr

Category

Noticias recientes
Tanzania presents itself as an emerging market in terms of renewable energies, and Geointec is collaborating actively in these projects.
Continue Reading
We started the year taking stock of the projects carried out, and we emphasize that only in the Iberian Peninsula Geointec has carried out more than twenty geotechnical studies for renewable energy projects, which affirms the increase in the production of green energy in the country.
Continue Reading
GEOINTEC was present at the last edition of the Congress on Renewable Energies of Chile, CIREC Week 2018, as part of the companies that make a difference in the Chilean and Hispanic-American photovoltaic market.
Continue Reading
GEOINTEC has been the company selected to perform the geotechnical studies for several solar plants located at 4,000 meters above sea level in Argentina.
Continue Reading
The retrospective study or "Back Analysis" is an effective method that allows to analyze the resistance of the land and to obtain, using the results from the load tests or "Pull Out Tests”, certain geotechnical parameters of the selected area for the construction.
Continue Reading
Hydrological studies and preliminary hydraulics are important to determine the feasibility and costs of civil works.
Continue Reading
Pull Out Test in Egypt Geotechnical studies were carried out in the Benban area.   As part of the work carried out by Geointec at an international level, and thanks to the request of different companies, who place their trust in our capacity and experience in the geotechnical sector. During 2017, we carried out five...
Continue Reading
GEOINTEC a réalisé une étude préliminaire pour l’implantation de la ligne de transmission d’un projet photovoltaïque pionnier à Madagascar. Notre équipe technique réalise sur le terrain la cartographie géologique et divers types de tests géotechniques le long des 17 km de l’itinéraire prévu pour la ligne électrique projetée, avec l’idée de fournir au client des...
Continue Reading
1 2 3 4