esenfr

Category

Recent news
Geointec has carried out two geotechnical studies for a solar photovoltaic farm in the province of Imbabura, Ecuador, with a total area of 400 hectares.
Continue Reading
Geointec has reached a collaboration agreement in Ecuador with the company CONINFRA to offer its services for solar and wind farms.
Continue Reading
After having participated in more than 10 solar PV projects in Australia, Geointec has opened a new subsidiary in SIDNEY in order to offer our services related to ground engineering
Continue Reading
Thanks to all! Thank you very much to all the visitors of our Booth in GENERA 22, it has been a great opportunity to share with all of you #GEOINTEC #GENERA #SolarProjects #PVprojects #Geotechnicalsurveys #RenewableEnergy #POT
Continue Reading
JOIN US! We are a young and a dynamic team and we are looking for people like you. SYDNEY | MADRID | LYON | SANTIAGO DE CHILE. 
Continue Reading
The drainage network of a solar park is necessary to avoid flooding or erosion problems that may occur during the service life of the park.
Continue Reading
Geointec has carried out the calculation for the earth movement of several solar parks under development in New York (USA), Atlántico Department (Colombia), Seville (Spain) and Ribatejo (Portugal).  Topography for solar parks. For these works, our topographic office has optimized by volumetric calculation the volumetric measurements, cuttings and embankments analysis; and as well as, the distribution of the...
Continue Reading
Geointec gave a lecture on geotechnics and foundations for photovoltaic solar projects, for students of the UPM University of Madrid.
Continue Reading
The Ramming & Pull Out Test for the calculation of foundations was carried out by destructive test load (failure), in Calama Chile.
Continue Reading
GEOINTEC returns to Africa to carry out a geotechnical study and topographic survey for a 40 MW photovoltaic solar project.
Continue Reading
1 2 3 4