Pre and post construction 2D hydraulic modeling.

Pre and post construction 2D hydraulic modeling.

What makes this 2D model interesting is the fact that the construction of the plant is taken into account in the calculations. The influence of the roads and civil works is studied, with the completion of the earthworks for the transformer stations.

Geointec offers modeling before and after plant commissioning to verify expected water levels and the operation of the drainage network.