esenfr

Tag

Hidrología
The installation of a PV farm requires both an erosion and flood risk assessment. The 330 Ha area was modeled using a hydrograph to represent small channels and streams and a hyetograph to model rainfall over the entire area. The modeling of the flow velocities of this project highlight the zones sensitive to erosion for...
Continue Reading
In this project, the study area for a PV plant was located downstream a dam. The numerical modelling of this dam in the worst situation, when the spillway is full, was necessary to check the impact on the studied area. In order to do this, a model based on hydrographs and composed of mesh with...
Continue Reading
Project for the construction of a solar farm in the province of Cuenca in Spain.
Continue Reading
What makes this 2D model interesting is the fact that the construction of the plant is taken into account in the calculations. The influence of the roads and civil works is studied, with the completion of the earthworks for the transformer stations. Geointec offers modeling before and after plant commissioning to verify expected water levels...
Continue Reading
Pull Test for a Solar PV Plant in the Pyrenees, with the first snowfalls during week W45.
Continue Reading
In eminently flat areas without rivers or canals, hydrological problems can arise in photovoltaic parks. The combination of intense rain and the impact of infrastructure on the land’s natural drainage network can cause significant flooding and areas of severe erosion. For this reason, hydrological and hydraulic studies are necessary to reduce the risks by optimizing...
Continue Reading
We started the year taking stock of the projects carried out, and we emphasize that only in the Iberian Peninsula Geointec has carried out more than twenty geotechnical studies for renewable energy projects, which affirms the increase in the production of green energy in the country.
Continue Reading