esenfr

News

In eminently flat areas without rivers or canals, hydrological problems can arise in photovoltaic parks. The combination of intense rain and the impact of infrastructure on the land’s natural drainage network can cause significant flooding and areas of severe erosion. For this reason, hydrological and hydraulic studies are necessary to reduce the risks by optimizing the location of the installation and ensuring proper sizing of the drainage systems.
Continue Reading
Geointec offers a suite of services in France, which include GEO + HYDRO + TOPO studies for project developers, pre-design studies for foundations + pull test + final design, for structural companies, as well as customized solutions for EPC.
Continue Reading
The Geointec-France team has participated in more than 10 solar photovoltaic projects in France, Spain, Greece and Portugal, and in countries on other continents such as Chile and Mozambique.
Continue Reading
Small Means of Distributed Generation projects are projects of less than or equal to 9MW of power that are connected to a medium voltage network
Continue Reading
With the new subsidiary in Lyon (France), we will contribute our experience of + 23GW to the development of the renewable market in Western Europe.
Continue Reading
1 2 3 4 5 6 24